Solar Atmospheres of Western PA (SAWPA) will expand their material hardening repertoire by adding vacuum oil quench (VOQ) capabilities. The decision to go with a vacuum oil quench was influenced by serious concerns for the environmental and furnace operator safety. The Safety & Health Achievement Recognition Program (SHARP) provides standards for health and safety, some of which caused Solar Atmospheres to question heat treating processes that utilize explosive endothermic gases and flammable open oil quench tanks. As a result of these concerns, Solar Manufacturing and Solar Atmospheres commenced engineering meetings in 2019 to design and build a US-manufactured, safe and quality VOQ.
Early this week, Bob Hill, president, SAWPA, Hermitage, PA, announced that the company had purchased and will install a new 36” x 36” x 48” VOQ furnace capable of safely quenching 2,000-pound loads without carbon potential concerns. The furnace, the first of its kind manufactured by Solar Manufacturing, Sellersville, PA, will be operational in early 2021.
Additionally, SAWPA is constructing a 15,000 square foot building to make room for the VOQ furnace line. Besides the VOQ furnace, the line also includes a parts washer, two tempering furnaces, and a charge car. The building expansion will be completed mid-summer 2020 making the entire SAWPA complex 120,000 square feet under one roof.